Safe Work Method Statement Tiling

Next

Tiling Safe Work Method Statement

Safe method statement tiling assesses the risk following the hazard identification process for tiling a wall and implementing risk controls to manage risks.

  • Method statement for wall tiling requires control measures to be implemented per the risk controls hierarchy for laying wall tiles connected with tiling works

Fire Sample P1.png
Fire Sample P24.png
Fire Sample P34.png
Fire Sample P37.png

SWMS Tiling Example

Click on the images to view a SWMS example of what you will receive when purchasing one of our SWMS.

Your business details and company logo will be added to the document and emailed to you.

Tiling SWMS

Workplace Safety has conducted a comprehensive hazard analysis for laying wall tiles, e.g. how to lay wall tiles with control measures developed for identified hazards per the hierarchy of risk controls.

  • Assess and review health and safety practices in the workplace to control risk

  • WHS consultation with employees on health and safety matters to identify potential hazards with how to lay tiles on walls

  • Risk assessment to identify hazard and risk in the workplace that could result in death or serious injury

  • Health and safety planning for how to lay tiles on wall, e.g. minimise risks through the planning process

  • WHS consultation and participation processes ensure adequate health and safety communication

  • Workplace environmental hazards, e.g. confined space and working at heights

  • Slip trips and falls in the workplace having the potential to cause death or serious injury

  • Implementation of controls for tiling walls, e.g. isolation of hazards and services in hazardous areas

  • Safety information for employees to control risks

  • Method to minimise risk when measuring to mark tile materials to be cut

  • Equipment needed for tiling, e.g. power drill, mixer

  • Cutting tools to cut wall tiles, e.g. tile saw, angle grinder

  • Preparing a wall for tiling, e.g. tiling walls, requires that bumps and high spots are removed

  • Method to minimise risk when setting out tiling works

  • Method of setting out wall tiles per tiling designs identified in a tiling plan

  • Mix tiling adhesive, refer to chemical safety data sheet for specific chemical hazards and control measures

  • Lay wall tiles per tiling layout plan, e.g. wall tiling methods

  • Grouting of tiles is the mixing of tile grout per chemical safety data sheets and how to grout wall tiles

  • Personal decontamination procedures to be implemented where exposure to silicahas taken place, e.g. correct method for removing PPE

  • Hazardous chemicals used in connection with tiling a wall, e.g. tile adhesive, tile grout

  • Hazardous manual tasks in connection with tiling a wall

  • Personal protective equipment, e.g. eye protection wear, chemical gloves, respirator

  • WHS training for workers, e.g. health and safety training for tiling walls

  • Workplace housekeeping incorporating material handling and storage safety

  • Legislative and regulatory requirements for compliance with WHS legislation, e.g. work health and safety regulations, construction work code of practice and wall tiling standards

  • Monitoring controls, e.g. assessment and review the effectiveness of control measures

  • Tiling tasks and activities in connection with tiling walls

SWMS Tiling

How to Lay Wall Tiles

Tiling SWMS shall assess the risk of construction high-risk activities for tiling walls.

High-risk work activities that may expose workers to WHS hazards are likely to include but not be limited to:

  • Working in a confined space

  • Plant and equipment used in the work task

  • Use of hand and power tools

  • Exposure to hazardous chemical, e.g. tile adhesive

  • Other hazards  with tiling walls

Method Statement for Wall Tiling
You may also need:
Tiling Safe Work Method Statement
SWMS for Rodding Mortar Dags.jpg
Safe Operating Procedure Angle Grinder
SWMS for Rodding Mortar Dags.jpg
Safety Management System
SWMS for Rodding Mortar Dags.jpg
  • FacebookLogoCurved
  • Instagram_logo

WHSONLINE.COM.AU

bottom of page